Puerto Rico Electric Power Authority (PREPA) has struggled with how to tackle the issue of balancing their unstable grid with the addition of renewables deployed on the island. Greensmith was selected to deliver a 1 megawatt energy storage system, integrated with a preexisting 3 megawatt solar PV array.

Scope: 
Turnkey
Size: 
1MW / 500kWh
Application: 
Behind-the-Meter, PV Integrated, Microgrid
State: 
Puerto Rico
Country: 
United States